top of page

Production Schedule

 

 

Filming day: 8th -9th-

 

Film schedule

 

8th November

9-10- Get equipment ready

10-11- starts shooting in the house close up of the controller and tv  at different angles

11-11.20-Break                                                                                                                                                                              

 11.20-2 - close up of mobile phone/messages that come up on the phone controller and TV at different angles

2–3-lunch

3-5-shoot

5-5.30-put equipment away

 

 

9th November

 9-10- Get  to location and get equipment ready

10-11- starts filming in our outside locations

11-11.20-Break                                                                                                                                                                              

11.20-2 – Start filming again

2–3-lunch

3-5-filming

5-5.30-put equipment away

                                                                   

By Minda

LMP PRODUCTION created with Wix.com

  • w-facebook
  • Twitter Clean
  • w-googleplus
bottom of page